Piaotang Tungsten Mine, Jiangxi Tungsten Group
Key words:
Project Name: Piaotang Tungsten Mine
Construction period: 2024
Filling capacity: 60 m³/h (daily processing capacity of 600 t)
Case description: The slurry flow rate reaches 60 m³/h, with a maximum conveying distance of approximately 1.0 km.
Classification:
Attachments:
Introduction/Results
General contracting for the filling system equipment at the Piaotang Mining Area of Jiangxi Tungsten Group; located in Ganzhou, Jiangxi, it is a national demonstration unit for safety standardization under the “Five Hundreds” initiative to strengthen and consolidate non‑coal mines.
The entire system meets the design capacity of 600 m³/d, with a filling slurry flow rate of 60 m³/h, a maximum conveying distance of approximately 1.0 km, and a slurry concentration of 72–74%. It is a typical high-concentration, low-flow-rate, long‑distance paste‑filling system.

Key words:
Previous Page
Next Page
Previous Page
Next Page
Related Products
Related Products
Welcome your message consultation