Project Name: Jiangxi Xinheng Mining
Construction period: 2019
Filling capacity: 60 m³/h (daily processing capacity of 600 t)
Case description: The plant has a total tailings processing capacity of 450–600 t/d, with a concentrate grade of ≥65%–70%.
Classification:
Attachments:
Introduction/Results
In 2019, a turnkey filling system was commissioned in Taishun, Zhejiang, comprising a full-tailings paste‑filling system. The system has a total tailings processing capacity of 450–600 t/d, with a concentrate grade of ≥65%–70%. It utilizes gravity‑flow tailings from the ore‑dressing plant and employs pressurized conveying.