Lingyuan Rixing Mining, China National Gold Group
Key words:
Project Name: China Gold – Lingyuan Rixing
Construction period: 2024
Filling capacity: 37.5 m³/h (daily processing capacity: 500 t)
Case Description: Complete set of filling system equipment, 8-meter vertical sand silo.
Classification:
Attachments:
Introduction/Results
A wholly owned subsidiary of China National Gold Group, the project is located in Chaoyang City, Liaoning Province. It features a complete backfilling system, an 8-meter‑tall vertical sand silo, and a tailings concentration of 25% at the thickener inlet. The particle size distribution is as follows: 59% passing 200 mesh and 51.92% passing 400 mesh. The hourly processing capacity (on a dry basis) is 37.5 t, with a daily tailings processing capacity (on a dry basis) of 500 t. The daily sand‑feeding duration is 13.5 hours.