Guizhou Jinlin Chemical Co., Ltd.
Key words:
Project Name: Guizhou Jinlin – Skyscraper Rush
Construction period: 2024
Filling capacity: 130 m³/h (daily processing capacity: 3,000 t)
Case description: Using the dihydrate phosphogypsum cemented backfilling process, the maximum required transport distance can reach 5.3 km.
Classification:
Attachments:
Introduction/Results
The full-tailings paste‑filling mining method is employed, whereby tailings are mixed with a cementitious binder and backfilled into mined-out areas. The filling system comprises a dedicated full‑tailings paste‑filling station equipped with three industrial filling pumps, each capable of delivering 125 m³/h. In 2023, our company supplied two industrial filling pumps; following one year of operation, an additional unit was procured at the end of 2024, resulting in a configuration of two pumps in service and one on standby.