Guangxi Cenxi Longwan Mining Co., Ltd.
Mine Type: Polymetallic ore
Project Name: Guangxi Cenxi City Longwan Mining Co., Ltd. Longwan Copper-lead-zinc Mine Filling System Construction Project
Date of construction: 2023
Filling capacity: tailings processing capacity 1873t/d, maximum 2500t/d
Case description: maximum conveying distance 3000m, height difference 100m
Project Summary
Guangxi Cenxi City Longwan Mining Co., Ltd. Longwan Copper Lead Zinc Mine Filling System Construction Project
Case of full tailings paste filling system (non-powered deep cone thickener vertical mixing barrel filling industrial pump)
Introduction
In order to reduce the pressure of tailings pond and improve the safety of underground mining, Hunan Yutai adopts unpowered deep cone thickener concentration and pumping pressure system for filling according to local conditions according to the requirements of Party A. The tailings of the dressing plant can increase the underflow concentration to more than 68% through the unpowered deep cone thickener, and the overflow concentration is less than 300ppm. The tailings are transported to underground goaf by filling pump to improve the ore extraction rate and increase the safety of mining operation.
Effectiveness
The concentrator works 330 days a year, 2 shifts per day, 8 hours per shift, the maximum conveying distance is 3000m, the elevation difference is 100m, the tailings treatment capacity is 1873t/d, and the maximum is 2500t/d. The filling capacity of the mine has been significantly improved, injecting new vitality into the sustainable development of the mine.
Previous Page
Previous Page
Other cases
Shandong Tangkou Coal Industry Co., Ltd. (under construction)
Project Name: Shandong Tangkou Coal Mine
Date of construction: 2024
Filling capacity: 220m³/h
Case description: Coal gangue cementation reconstruction for coal mine, with a maximum conveying distance of 7000m
Guizhou Batian Ecological Co., Ltd.
Project Name: Guizhou Batian Ecological Co., Ltd. Xiaogaozhai Phosphorus Tailings Filling Project EPC
Construction date: 2022
Filling capacity: 250 m/h
Case description: tailings plus phosphogypsum paste cementation filling, conveying distance of 3000 meters.