Guangxi Cenxi Longwan Mining Co., Ltd.
Mine Type: Polymetallic ore
Project Name: Guangxi Cenxi City Longwan Mining Co., Ltd. Longwan Copper-lead-zinc Mine Filling System Construction Project
Date of construction: 2023
Filling capacity: tailings processing capacity 1873t/d, maximum 2500t/d
Case description: maximum conveying distance 3000m, height difference 100m
Dezhou Haohua Qingping Phosphate Rock Co., Ltd.
Mine Type: Phosphate rock
Project Name: EPC General Contract of Deyang Haohua Qingping Phosphate Mine Filling Project
Construction time: 2022
Filling capacity: annual filling volume 450000 cubic meters
Case description: tailings plus phosphogypsum paste cementation filling, conveying distance 2000m, downward depth 200m
Lingbao Gold Group Co., Ltd. Nanshan Branch
Mine Type: Gold Mine
Project Name: Construction Project of Filling Station in Kexin Mining Area of Nanshan Branch of Lingbao Gold Group Co., Ltd.
Construction time: 2022
Project Address: Lingbao City, Sanmenxia City, Henan Province
Filling capacity: 60 m/h
Case description: filling station civil engineering, equipment general contracting, gold mine filter tailings paste cementation filling system.
1. Maximum daily treatment capacity of tailings: 1000t/d.
2. Tailings conveying distance: 250 meters, lift 35 meters.
Mine Type: Gold Mine
Project Name: Construction Project of Dora Nasa Yijin Mine Filling System of Habahe Huatai Gold Co., Ltd.
Construction time: 2023
Project Address: Habahe County, Altay Prefecture, Xinjiang
Filling capacity: 70m ³/h
Case Description: EPC General Contracting for Filling System Construction, Gold Mine Filter Tailings Paste Cementation Filling System
Tibet Huatailong Mining Development Co., Ltd.
Mine Type: Gold Mine
Project Name: Equipment Procurement Project of Tibet Huatailong Mining Development Co., Ltd.
Construction time: 2023
Filling capacity: 300 m/h
Case description: Filling system equipment supply; full tailings cement or cementitious materials. Pumping 510 meters vertically, reaching a new height of pumping.
Project Address: Duilong Deqing District, Lhasa City, Tibet
Hunan Western Australia Mining Co., Ltd.
Mine Type: Gold Mine
Project Name: Hunan Western Australia Mining Co., Ltd.
Construction date: 2022
Filling capacity: 70m ³/h
Case Description: Full Tailings Paste Cemented Filling